Test piles and pull-out tests for solar projects

Check the installation approach before full production.

Scope and mobilisation

Test piles and pull-out tests are available when included in the agreed project scope. Clearenergy coordinates field work with the project team and uses the approved design and geotechnical information to plan execution.

Information for a quotation

Send the test locations, profile specifications, geotechnical report, required test procedure and acceptance criteria. Loading requirements, test equipment, reporting responsibilities and any external engineering supervision must be agreed before mobilisation.

Execution and responsibilities

Test results support project-specific decisions about installation methods and possible pre-drilling. Final foundation design and acceptance remain with the responsible project engineers; site testing does not replace their design review.